Stainless steel decorative pipe control machine

1.StainlesssteeldecorativepipecontrolmachineStainlesssteeldecorativepipemachineismainlyusedfortheproductionofstainlesssteelpipesandcarbonsteelpipesfordecoration,productsandhouseholdappliances.Afterthe

1. Stainless steel decorative pipe control machine

Stainless  steel decorative pipe machine is mainly used for the production of  stainless steel pipes and carbon steel pipes for decoration, products  and household appliances. After the moulding of this series of units,  round pipes, square pipes and rectangular pipes can be drawn out. It can  also produce elliptical pipes, semi-circular pipes, plum blossom pipes  and other special-shaped pipes. Such as: stainless steel staircase  handrails, burglar proof doors and windows, electric heating pipes, etc.

2, automated production process:

Through  the continuous forming process of uncoiling, feeding guidance, marking,  forming, welding, external weld grinding, shaping and sizing, sizing,  cutting (coil), jointing, etc., the structure is fine and the operation  is simple.

3. Product  characteristics: the machine is strong, durable, high precision, fully  automated, simple to operate, continuous production, high efficiency,  less waste of materials, high yield, low production cost.

4, technical parameters:

Model

Horizontal(mm)

Vertical (mm)

pipe diameter(mm) 

Tube thickness(mm) 

Motor power

Assembly size L*W(m) 

Specification for decorative pipe control machine

met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.5

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m


Operational considerations:

1, ensure smooth production and meet product requirements.

1.2 effective maintenance of equipment.

1.3,  write reasonable operation instruction procedures to ensure the  production plan and product quality achieve the desired goals.


2, scope of use:

Workshop management department.


3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2  accurately control the operation of the machine before shift and  coordinate with normal production. Pay attention to the opening of  water, gas or electricity, grinding the wheel, saw blade and cutting  table.


4, boot:

4  before starting, according to the lubrication requirements, injecting  different lubricants to the parts where the lubricating oil is required  to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2  Check whether the mechanical parts and pneumatic system are normal or  not. If there are abnormal phenomena, they should be checked and  eliminated in time so as not to cause mechanical equipment accidents.

4.3  Check the transmission gear is correct, otherwise there will be quality  problems, whether the pressure gauge of the cutting machine reaches  0.5-0.7 mpa, otherwise it can not be cut.

4.4  Let the motor run empty for 2-3 minutes before going to work every  morning. The transmission gears are equal to 0. When driving, the  operator is not allowed to leave the machine tool and do other  irrelevant things.

4.5 it is  strictly prohibited to wear gloves to boot, long sleeved clothes must  wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8  during the operation, you are not allowed to leave the machine tool.  You are not allowed to do other irrelevant things, and pay attention to  whether the welds are normal.

4.9  In the process of pipe-making, the cutting strip must be consented by  the workshop director, stored in the belt-laying area, and recorded in  detail with the sling operator on the Production Process Card. It must  not be discarded at will.

4.10  If abnormal phenomena are found in operation, such as smoke, burning  odor, sudden fuse burning, sudden extinguishment of indicator lights and  timely switching off the power switch to be checked out, then turn on  operation after troubleshooting.

4.11  the product's length is checked regularly, not more than 6.01 meters,  not less than 6 meters. Strictly controlled between 4mm. The pipe on the  unloading pipe rack should not exceed 95% of the total capacity, so  that the flat mouth personnel should be lifted in time, otherwise the  operator will be responsible for the damage.


5, downtime:

5.1 stop welding while closing the power supply.


  • <button id="ml04a"></button>
    <li id="ml04a"></li>

    1. <span id="ml04a"></span>
      <rt id="ml04a"></rt>

        <label id="ml04a"></label>
          主站蜘蛛池模板: 富蕴县| 尚志市| 遂昌县| 德庆县| 瓦房店市| 蒲城县| 蛟河市| 庆安县| 桑植县| 垦利县| 吴江市| 湟中县| 社旗县| 巢湖市| 乌审旗| 贵州省| 施秉县| 宜兰市| 贺州市| 北京市| 长兴县| 安阳市| 阿克苏市| 鸡泽县| 石泉县| 湾仔区| 准格尔旗| 徐水县| 滦南县| 花莲市| 天峨县| 黄骅市| 蓬安县| 秭归县| 沙河市| 灵石县| 伊春市| 金寨县| 旅游| 班戈县| 筠连县|